TeraSteel built a complex of 3 Turnkey Halls, in Craiova, having as destination storage and packaging production halls, totaling constructions of 1,500 sqm (footprint on the ground). TeraSteel controlled the entire production cycle of the halls - from design, production, delivery and assembly.